A different look for Point A [a gallery]
Published 3:33 am Saturday, October 7, 2017
1 of 4
PowerSouth’s drawdown of Point A Lake reached scheduled levels to allow property owners to begin construction activities this week. The drawdown, which began Sept. 15, was planned to allows to allow for maintenance to the Point A Hydroelectric Dam. Public access points to the lake are closed until December.